TECHNICAL PROCUREMENT

Procurement guides — Page 3

Answers, conditions and checklists for technical purchasing decisions.

Pilot acceptance evidence

What Evidence Should Buyers Require Before Accepting a PFAS Electrochemical Oxidation Pilot?

Before accepting a pilot for per- and polyfluoroalkyl substances (PFAS), name the claim the pilot must support and the streams it must account for.

Explore requirements
Installation & Commissioning

How to Document Commissioning of a Deep-Well ICCP Anode System

Agree on three handover milestones for a deep-well impressed current cathodic protection (ICCP) installation.

Explore requirements
Selection & Acceptance

How to Specify Water Fill and Level Alarms for a Lab PEM Hydrogen Generator

State how the offered proton exchange membrane (PEM) hydrogen generator will be filled, where its water requirement applies and which water level indications the lab must see.

Explore requirements
Drawings & Supplier Quotations

How to Clarify Deep Titanium Threads on a Drawing Before Quotation

Before quoting a deep internal thread in a titanium part, agree on the usable threaded region, the reference face from which it is measured and the mating part's required engagement.

Explore requirements
Supply Scope & Site Acceptance

How to Separate Generator Output from Low Residual in Wastewater Disinfection

When a wastewater plant uses an on-site sodium hypochlorite generator, write separate checks for generation, delivery to the dosing point and downstream residual.

Explore requirements
Retrofit Trials & Release

How to Agree Nickel Thickness Measurement Points Before Changing Rack Anodes

Approve the measurement locations on a representative part before comparing a rack anode change in nickel electroplating.

Explore requirements
FEED and procurement release

What Can a PEM Electrolyzer Buyer Commit to During FEED?

A purchasing guide to the documents that support PEM electrolyzer engineering, budget approval and release for manufacture during FEED.

Explore requirements
Delivery Inspection & Acceptance

How to Verify Platinized Titanium Anodes at Receiving

Before a platinized titanium anode enters a process bath, match the delivered part to the purchase drawing and verify three records.

Explore requirements
Drawings & Final Acceptance

Specify Titanium Part Fits in the Finished Condition

Put the required finished dimensions on the drawing before releasing a titanium part for machining and surface treatment.

Explore requirements
Supplier Qualification & Contract Delivery

Who Signs Off When Titanium Part Finishing Is Subcontracted?

Name the organization responsible for the finished titanium parts in the purchase order.

Explore requirements
Supplier Comparison & First Article Planning

What to Verify Before Qualifying a Second Source for Titanium Parts

Give both suppliers the same released package before comparing prices for a custom titanium part.

Explore requirements
Utilities scope and acceptance

How to Specify Reclaimed Industrial Water for a PEM Electrolyzer Project

A guide to comparing industrial reclaimed-water intake and treated-water handover for a PEM electrolyzer project.

Explore requirements