How to Verify Platinized Titanium Anodes at Receiving
Before a platinized titanium anode enters a process bath, match the delivered part to the purchase drawing and verify three records.
Table of Contents
Before a platinized titanium anode enters a process bath, match the delivered part to the purchase drawing and verify three records. Check the substrate identity, the specified platinum coverage and the coating measurements for the delivered lot. Keep any unresolved discrepancy visible in the receiving record so the authorized reviewer can decide whether the anode can be released.
Confirm which surfaces belong in the inspection
Use the approved drawing and coating specification to identify the titanium substrate, active faces and deliberately uncoated zones. On a mesh or assembly, distinguish the working area from cut edges, attachment points and electrical contact areas. Reference the drawing revision on the purchase order and ask the supplier to identify the parts or packs against that revision.
A substrate record establishes which material was supplied when its identifiers match the delivered part. The coating record should establish the specified platinum metric and its available evidence. If the order uses platinum mass per unit area, identify the reference area and reporting units. If it uses thickness, identify the locations and whether the requirement controls a local result, an average or both. Keep any customer-approved comparison or conversion basis with the order.
Match each coating reading to a point and a lot
Agree before shipment on a drawing or image with numbered locations. Ask which points are accessible on the supplied geometry, how the samples are selected and what the report should say about the instrument, calibration or reference checks. A measurement plan for a plate can require changes for narrow strands, wire or curved surfaces. The reviewer should know whether the instrument and setup are suitable for the part and the specified coating range. ISO 3497 describes X-ray spectrometric methods for coating thickness. ISO 3882 reviews several thickness methods and explains that usable ranges depend on the coating, substrate and instrument. ISO 3497 ISO 3882
Ask for the part or sample identifier, coating lot, individual results and the decision against the stated limits. Where a witness coupon is used, define in advance what it represents. Record its link to the lot and any differences in shape, position or processing that may affect how the results apply to the supplied anode.

Concept anode separates active and contact areas and links agreed sample locations to a lot report. Conceptual illustration only; symbols do not represent actual products, measurements, certificates or completed approvals. Sample locations and count must follow the agreed inspection plan.
Keep receiving exceptions linked to the supplied parts
Photograph a stain, apparent gap or damaged area in context and close up. Record the part identifier, location, package condition and when the observation was made. Compare it with the coverage drawing and the agreed appearance criteria. An appearance observation can direct a follow-up inspection. Record thickness, material identity or condition separately when those findings require their own evidence.
If a measurement falls outside its limit or the lot linkage is missing, isolate the affected items from released inventory. Ask quality and the supplier to confirm the measurement setup and the scope of the affected lot. Record the agreed retest or disposition under the purchase requirements. Keep the original result and the follow-up together.
For a Pt/Ti enquiry, send the drawing, electrolyte and operating duty, the area requiring platinum and the inspection evidence you need at receiving. HELE platinized titanium anodes
Frequently asked questions
What should the supplier declare about the substrate?
Request the specified titanium designation and the document or part marking that links it to the delivered lot. Define whether the order needs a material certificate and how the identity is maintained through processing.
Where should platinum coverage be marked?
Mark the active surfaces and exceptions on the drawing or an approved view. Be explicit about which sides, edges and contact zones are included when they matter to the design.
How many coating thickness points should be checked?
Set the sample plan for the actual geometry and the purchase limits. Identify critical locations and ask quality to agree how inaccessible points and readings near a limit will be handled.
Can a coating report from a previous order be accepted?
Use prior reports as background when evaluating a proposed process. For receiving, check the identifier that connects the submitted results to the delivered lot and the current drawing.
What can an unusual colour show on arrival?
It identifies a location to record and review against the agreed condition criteria. Ask for additional evidence if the team needs to identify the cause or establish coating conformity.
What happens when one point is outside tolerance?
Use the agreed lot hold and follow-up process. Keep the original reading, inspect the setup and confirm who can decide between additional inspection, replacement or an approved disposition.
Prepare a technical enquiry
Share the process or protected asset, operating conditions, geometry or drawing, and the scope you need reviewed.
Ask a technical question →