Procurement guides
Titanium Anode Purchasing Checklist
Begin with the target reaction, electrolyte, temperature, current and active-area basis.
Procurement guides
Begin with the target reaction, electrolyte, temperature, current and active-area basis.
Product comparisons
Two quotations become comparable when they describe the same substrate, geometry, active-area definition, coating coverage, connection, operating duty and acceptance requirements.
Product comparisons
A stack supply requires the integrator to define electrical, water, cooling, gas and control interfaces.
Procurement guides
Name the delivery and measurement point. Stack outlet gas, gas after conditioning and hydrogen delivered to the user can have different specification boundaries.
Procurement guides
Compare like boundaries and operating conditions. A DC stack value is not automatically the electrical input required by the complete AC-powered system.
Procurement guides
Start with the ordered product specification, applicable edition and purchase requirements. The inspection plan should follow the actual material, product form, manufacturing route and agreed acceptance basis.