Hydrogen Delivery Conditions
Name the delivery and measurement point. Stack outlet gas, gas after conditioning and hydrogen delivered to the user can have different specification boundaries.
Table of Contents
State the requirement completely
Provide the required gas quality and any separately controlled constituents or moisture requirement. Identify the sampling point, measurement basis and intended operating conditions. A percentage without a defined basis is not a complete acceptance criterion.
Connect the requirement to the scope
Identify the proposed drying or purification equipment and whether it is included, optional or provided by others. State the required flow and pressure at the same agreed boundary. Do not combine values taken from different configurations.
Agree how it will be verified
Confirm the applicable test method, instrument basis, operating condition and record needed for acceptance. Use configuration-specific approved information. This guide does not state a universal HELE purity value or imply that downstream gas conditioning is always included.
Prepare a technical enquiry
Share the hydrogen or test duty, operating conditions, interfaces and the equipment scope you need reviewed.
Ask a technical question →