Industrial hydrogen users
Record what consumes hydrogen, the operating schedule and the conditions at the equipment that uses it.
Find a starting point for on-site PEM hydrogen production, pilot projects and stack integration. Start with the gas delivery point and site utilities.

Record what consumes hydrogen, the operating schedule and the conditions at the equipment that uses it.
Identify the project stage, expected operating profile and which site inputs are known.
Define whether you need an electrolyzer stack or a system, and identify which auxiliary equipment and controls are in your scope.
Start with the delivery and equipment boundary. Compare packaged systems and stack-only supply against the same demand and site requirements.
Review the required output and the scope needed to deliver gas at the point of use.
Start with the demand profile, required gas quality, pressure, point of use and available utilities.
Set the gas delivery point and the flow, quality and pressure required there.
Identify supporting equipment and responsibilities when comparing proposals.
Prepare the power, water and cooling information needed for equipment review.
A reusable worksheet for recording known conditions, units, document revisions and open questions.
Download CSV ↓