Specify Titanium Part Fits in the Finished Condition
Put the required finished dimensions on the drawing before releasing a titanium part for machining and surface treatment.
Table of Contents
Put the required finished dimensions on the drawing before releasing a titanium part for machining and surface treatment. Identify the features that control assembly, which surfaces must be protected during finishing and how the delivered part will be inspected. A separate in-process limit can help the machinist prepare for the treatment, while the final drawing controls the fit the buyer needs.
Mark each feature that must fit after finishing
Start with the mating component and the way it locates. On a shaft, the fit diameter and the shoulder that sets its axial position may need different protection and checks. On a housing, identify the bore, the sealing face and any threads that must accept mating hardware after finishing. Record the condition and datum used for each acceptance measurement.
Show the finished state and any permitted in-process state on distinct views or controlled instructions. When both callouts appear in the order, give the reports clear names so a dimension taken before treatment cannot be mistaken for the final value. If the assembly allows a range of clearances, use the design owner's released limits. ASME Y14.5 describes the drawing language used to express and interpret dimensional and geometric requirements when that convention is specified. ASME Y14.5
Approve the boundary of the surface treatment
Issue a drawing or approved view showing treated surfaces and any zone to be masked. Describe the location of the boundary relative to the locating or sealing feature. Where a transition matters, ask the finisher to review access, the masking approach and the ability to inspect the result. A general finish note leaves those details open for clarification.
If the process could affect the feature size, let the responsible design and manufacturing teams agree the unfinished limits using evidence for the proposed route and part. Ask them to check any change in process, extent or rework against the finished requirements. Published data for zinc-plated steel or anodized aluminium describe those materials and processes. Use data for the specified titanium part and treatment when setting its allowance.

A generic shaft and mating opening illustrate finished fit, masking boundary and final inspection. Conceptual illustration only; symbols do not represent actual products, measurements, certificates or completed approvals.
Inspect the finished feature and retain the result
Link the inspection record to the finished lot and the approved revision. Specify the tool, support and locations for final measurement, or identify an approved functional gauge where that check represents the requirement. Record the actual result and any exceptions at the location the drawing controls.
If film thickness also has a limit, give it a separate line in the inspection plan. A coating thickness test measures film under the agreed method and setup. The fit measurement checks the geometry of the delivered feature. ISO 3882 summarises thickness measurement methods for metallic and other inorganic coatings. Select the applicable test for the actual finish and substrate. ISO 3882
For a titanium finishing enquiry, share the released drawing, the required finish and extent, the mating feature and the checks needed in the delivered condition. HELE surface preparation and finishing
Frequently asked questions
Which dimensions apply after surface treatment?
Use the limits identified for the finished part on the released drawing or purchase specification. Ask the design owner to clarify any ambiguity before processing.
Who approves the unfinished dimensions?
The responsible manufacturing and design teams should agree the intermediate limits and how they support the specified finished part. Keep the approved change with the production instructions.
How should a masked zone be shown?
Use a view or detail that identifies the protected surface and the location of the boundary. Specify any permitted variation where it affects the assembly.
Does a film thickness result establish a finished fit?
It establishes the film measurement for the agreed check. Use the required finished feature measurement or approved functional gauge to verify fit.
When is a trial fit useful?
Use it where the buyer has defined a representative mating part or gauge, the assembly condition and the result to record. Retain the dimensional checks required by the drawing.
What should happen if the finishing process changes?
Send the proposed change to the designated authority with the affected features and inspection implications. Use the agreed approval and verification steps before processing the affected parts.
Prepare a technical enquiry
Share the product form, grade or standard, dimensions, quantity and inspection requirements.