What to Specify for a Continuous Anode Lead in a Buried ICCP RFQ
Specify both cable endpoints, a continuous lead requirement and inspection evidence for a buried ICCP anode request for quotation.
Table of Contents
Approve both ends of the anode lead on the controlled drawing before asking for a quote. For an impressed current cathodic protection (ICCP) system, the purchase order should make the factory connection, the named delivery endpoint, the length basis and any continuity requirement clear. A lead quoted simply by length leaves the measuring points and field responsibility open.
Identify the endpoints on the supplier drawing
Name the anode assembly and the terminal, junction box or other endpoint shown in the approved design. Ask the supplier to identify where its assembly starts and where its supplied conductor ends. Mark any separate header, box or termination item on its own line. Confirm whether the quotation includes the endpoint hardware or delivers a factory-attached lead for connection by another party.
A U.S. Bureau of Reclamation installation guide gives an example of leads running from the anode to the anode junction box without intermediate splices. Use that example to see why the endpoints matter. The requirement for a particular project comes from its contract and design. Bureau of Reclamation cathodic protection field guide

Make the length a reviewable quotation item
| Item to confirm | What to put in the order |
|---|---|
| Assembly identity | Anode tag, drawing revision and lead identifier for each item |
| Supply limits | Factory connection and named endpoint, with any separate header or terminal item identified |
| Length basis | Agreed measuring points and whether the specified value is total lead length or available length beyond a defined point |
| Continuity and exceptions | Where continuity is required and who reviews any proposed exception |
| Release evidence | Required dimensions, identification and factory inspection records, with any site checks assigned separately |
Have the site design owner confirm the routed length and any project allowances. Ask bidders to return the same schedule with their proposed supplied lengths and exclusions. When cable and anode items come from different vendors, retain one interface drawing so that each release references the same endpoint.
Agree how the buyer will handle a discrepancy
Specify which supporting documents the factory will provide and how receiving will match the lead tags and offered lengths to the packing list and order. An installation-stage witness point, if required, belongs in the site plan with its own owner and record. If a delivered lead is shorter than required, or the proposed endpoint changes, document which assemblies are affected and request a disposition from the project design authority. Record that decision before releasing the affected scope.
Frequently asked questions
Is the underground route distance the same as the ordered lead length?
Have the site authority establish the route and applicable allowances. The order should state the resulting length and how the supplier measures it.
Can different anodes use different lead lengths?
List the approved requirement by anode and lead ID. Match each delivered assembly to that schedule at receiving.
How can bidders show what they supply at the far end?
Ask for a marked endpoint and explicit inclusion or exclusion of connectors, junction hardware and field labor.
Who approves a change to the approved continuity requirement?
Use the design authority named in the order and document the decision against the applicable anode and drawing revision.
What can be checked before installation?
Review identity, the agreed length record, required factory documentation and visible condition under the receiving plan. Assign any installed checks separately.
What if the field route changes before delivery?
Have the responsible party review the new route against the approved endpoint and supplied length, and get the resulting scope change in writing.
Request an anode assembly quote
Send HELE TITANIUM the approved anode and lead schedule, endpoint drawing, quantities and required release documents. Review ICCP anode installation configurations · Submit the approved scope
Prepare a technical enquiry
Share the process or protected asset, operating conditions, geometry or drawing, and the scope you need reviewed.