How to Specify Installed Open Area for a Titanium Screen Panel

Compare pattern, panel and installed open area and account for the openings blocked by the mounting assembly.

Table of Contents

Put the percentage and its reference area on the drawing before approving a titanium screen. Then show the openings that will remain exposed once the frame, clamps and supports are installed. A quote that lists open area for a repeating pattern leaves the installed value unresolved.

Define the three reported areas on one drawing

First identify the regular pattern or the part of the panel used for the pattern calculation. Next give the full outer dimensions of the screen panel, including any solid borders. Finally show the assembly drawing that defines the installed window, with an explicit projection direction where relevant. Report the resulting clear opening area and state which reference area is used when expressing it as a percentage.

Reported quantityReference areaWhat goes in the numerator
Pattern open percentageAgreed representative repeating pattern zoneOpenings in that pattern zone
Full-panel open percentageFull projected area inside the panel perimeterOpenings contained within the panel boundary before assembly
Installed open percentageAgreed installed window or another stated assembly referenceProjected openings inside that boundary that remain unobstructed

Use the actual order definitions if its terminology differs. Report dimensions, area and percentage together so the buyer can reproduce the result.

Three views show a perforation pattern, a full panel with solid borders and an installed window with a support.
Concept comparison of three reference areas. Use the mounting drawing to identify the openings that remain clear in the installed window.

Mark what covers openings in the installed view

Overlay the panel and mounting drawing at the agreed orientation. Identify the solid margins, the areas captured by the frame, and the support or clamp surfaces that cover openings inside the reporting boundary. Calculate the unobstructed portions of the apertures. If two obstructions overlap, account for their combined footprint on the openings once.

For a regular perforated sheet, a pattern calculation may be a useful check. At the installed boundary, count full openings and account for the exposed portion of intersected openings with the approved CAD or inspection method. State how the drawing treats incomplete or irregular holes. Woven, expanded and perforated constructions have different geometries. Record the forms, viewing direction and calculation method that apply to the selected screen.

Compare the values on a stated basis

In this hypothetical drawing review, the unframed screen has 5,000 mm² of aperture area. The regular perforated zone spans 25,000 mm² and contains all of those openings. The complete panel spans 30,000 mm². The installed window covers 25,000 mm² before deduction for the support projecting inside it. After the assembly overlay, 3,500 mm² of openings remain clear.

Example reportCalculationResult
Pattern zone5,000 mm² divided by 25,000 mm²20.0%
Full panel5,000 mm² divided by 30,000 mm²16.7%
Installed window3,500 mm² divided by 25,000 mm²14.0%

These example values illustrate the reporting method. In an actual project, the drawing owner defines the installed denominator and decides whether to accept a drawing calculation, first-article measurement, or both.

Approve the report and the performance test separately

Ask for the two drawing revisions, the stated projection and reference areas, the method used to account for covered or partial openings, and the result. For a first article, identify which dimensions and fitted conditions the buyer will check on the assembly. An agreed drawing area establishes a geometric result. Flow, retention and pressure drop also depend on the geometry, thickness, medium and duty. Set any required performance test and responsibility with the equipment designer.

See the HELE TITANIUM mesh buying guide for geometry, material and fabrication inputs.

Frequently asked questions

Does nominal pattern open area include solid margins?

Only include them if the order specifies that denominator. A regular pattern percentage commonly applies to its stated repeating zone. Show the full-panel value separately when it matters.

How do the frame and clamps affect the report?

Mark the area where each part covers an opening in the agreed assembly projection. Deduct the apertures or fractions actually covered inside the installed window.

Can we calculate installed open area from a standalone screen drawing?

Use an approved assembly view to determine the position and size of anything that blocks openings. Ask who controls the mounting geometry when it is supplied separately.

How should we report holes cut by the window boundary?

Document the rule for partial holes and the method used to determine their exposed area. Include that basis in the report.

Can the same calculation be used for expanded and woven mesh?

Use a method that represents the selected construction. Confirm its viewing direction, dimensions, orientation and treatment of edges or overlaps.

Does the installed percentage establish pressure drop?

Specify any hydraulic or airflow acceptance with the equipment designer. Installed open area is one geometric input to that verification.

Request a screen drawing review

Send HELE TITANIUM the opening geometry, panel and mounting drawings, orientation, the required area basis and any approved service or acceptance criteria. View titanium mesh · Submit a screen enquiry

Prepare a technical enquiry

Share the product form, grade or standard, dimensions, quantity and inspection requirements.

Ask a technical question →
Portrait of Bobby Fu

Project contact

Bobby Fu

Co-Founder · Senior Project Manager

Bobby Fu is a co-founder and senior project manager at HELE Titanium, with a background in international product development and manufacturing. His project work covers titanium materials, titanium anodes, and PEM water electrolysis systems. He works with industrial buyers and production teams to clarify material specifications, equipment interfaces, and inspection requirements before orders are placed.

View Bobby’s Profile
WhatsApp