How to Control a Customer-Supplied Mating Part for First-Article Acceptance
Record which customer-supplied mating part is approved for first-article fit, who may use it and how to close custody.
Table of Contents
Give a customer-supplied mating part an identity and an agreed purpose before it reaches the first-article bench. Record its condition when it arrives, who may use it, what the fit check is meant to establish and how the item will be returned. Keep the property record linked to the inspection, so the buyer can verify both the fit result and what happened to the item it sent.
Decide what the supplied item represents
List the owner, item ID, drawing revision or other agreed reference, quantity and function in the test. A production mating part may represent the actual assembly. A reference sample, gauge or previously used component may have a narrower role. Ask the buyer to define that role and what evidence a check with the item can support.
Record any visible wear, damage, modifications or signs of prior use with the buyer’s agreed acceptance method. Attach photos where permitted and identify any surfaces or features that must be protected during handling. A published automotive supplier manual illustrates the value of identifying and controlling buyer-owned tooling and equipment. The scope of this mating-part loan should be agreed separately in the actual order. Example supplier quality manual
Give the inspector and the custodian the same record
| Stage | What to record | Who should agree |
|---|---|---|
| Receipt | Ownership, ID, revision, quantity, condition and discrepancy status | Buyer and receiving custodian |
| Permitted use | Allowed fit exercise, protected features and any restriction on modification or retention | Buyer drawing or property owner |
| Fit evidence | Actual item used, assembly conditions, result and separate drawing inspections | Assigned inspection and engineering roles |
| Substitution | Reason, proposed replacement identity and checks that need repeating | Buyer authority for the fit decision |
| Return or retention | Final condition, quantity, packing or return reference and approved exception | Property custodian and receiving party |
Link the record to the specific first article. If the assembly check passes, record what it demonstrated and retain the required measurements for the drawing. The purchase order defines whether a formal first-article inspection requirement applies.

Close the loan after inspection
Before return, match the condition and quantities to the receipt record. Document a change in condition and refer it to the named property owner. Send the agreed return or retention record with the inspection evidence. If the item is needed again for a later lot, obtain approval for that use and keep its revision and condition traceable.
Frequently asked questions
Can the customer-supplied part replace a drawing inspection?
Use the item for the fit verification the buyer approved. Keep the drawing checks required for separate characteristics.
What if the part arrives worn or damaged?
Identify the discrepancy and preserve the receiving record. Ask the buyer to confirm its suitability for the intended check or provide an approved replacement.
Can a supplier use a locally available mating part instead?
Record the proposed substitute and what it represents. Obtain the named authority’s approval and identify any checks that must be repeated.
What should a successful fit result identify?
Record the actual mating item and first article, the assembly conditions, the approved criterion and the observed result.
Can a mating part be kept for repeat orders?
Agree the purpose, duration and identity of any retained item with the owner. Record any limits on use and the eventual return arrangements.
How should custody close when the part is returned?
Record the return quantity and condition, shipment or handover reference and any open exception. Ask the receiving party to confirm the return as agreed.
Request a first-article scope review
Send HELE TITANIUM the controlled drawing, supplied mating item ID, permitted use and the fit and return records you need. Review CNC titanium parts · Send the scope for review
Prepare a technical enquiry
Share the product form, grade or standard, dimensions, quantity and inspection requirements.
Ask a technical question →