How to Match an Outsourced Heat-Treatment Furnace Record to a Titanium Parts Lot
Reconcile returned titanium parts against a furnace chart, load record and processing lot before authorizing release.
Table of Contents
Before releasing a returned lot of titanium parts, match each furnace record to the actual pieces it covers. Start with the machining lot and quantities sent out. Follow those identifiers to the processor’s load record and the returned parts. Then verify that the required process and release records cover the shipment. A chart can document an identified furnace run while leaving its connection to the returned parts unresolved.
Read the furnace chart and the load record together
A furnace chart records the time and temperature readings associated with the run. Ask the processor to identify the furnace, run and treatment date on the chart or on a controlled record linked to it. The load record or another approved cross-reference must connect that run to the applicable order and the parts it contains. A certificate of conformance and any required test reports answer separate questions defined by the order.
One published buyer document, United Titanium’s purchasing quality statement list, separates markings linked to original mill certification from the furnace chart and heat-treatment certification. Clauses UTI-08 and UTI-09 illustrate the two records when the order invokes those clauses. Scope the actual paperwork and signatures to your own purchase order. Example purchasing quality clauses, page 2
Build a record that can reconcile split runs and returns
| Record | Link to keep | What receiving should check |
|---|---|---|
| Material certificate and stock issue | Parent heat or stock lot to the affected part or manufacturing lot | Material identity remains traceable |
| Processor dispatch record | Part number and revision, machining lot and exact quantity sent | The processing order names the same items and required revision |
| Processor load record and chart | Assigned pieces or controlled sublot, run ID, furnace ID, date and chart reference | Each sublot connects to its actual run and required evidence |
| Return and disposition record | Returned identities and quantities, applicable process records, open exceptions and authorized release | Each quantity is accounted for, with any unverified part group clearly identified |
For example, a hypothetical dispatch sends 12 identified parts. The processor’s load record assigns seven to Run A and five to Run B. On return, a record for Run A covers only the seven parts if the receiving team can still identify them. The other five require the evidence for Run B. If the parts were mixed and the receiving team cannot recover their identities, place the affected material on hold for reconciliation. Any partial release requires its own evidence and the authorized buyer or supplier disposition specified by the order.

Resolve chart and quantity discrepancies before release
Ask the contracting supplier to identify the affected quantity and obtain the controlled cross-reference or corrected record from the processor. For orders that require charts, confirm that the document revision, run identity and any required signatures align with the certification. If a part was treated again, preserve the original and repeat run references. Ask which parts were affected and which approved route and evidence support the proposed disposition.
Keep the outcome attached to the returned lot or sublot. The release record should identify who made the decision and which required dimensional checks, process evidence or tests are still open. Review the HELE TITANIUM material certificate and inspection guide for the wider material identity chain.
Frequently asked questions
Can the mill certificate establish that the parts were treated by the subcontractor?
The mill certificate covers its stated material and tests. Use the order-specific processing evidence to verify the outsourced treatment of the returned parts.
How do the material heat number and the furnace run ID differ?
The heat number refers to the originating material heat. The run ID identifies a processing event. Link both to the machining lot where the order calls for that traceability.
What if one machining lot was processed in two runs?
Record which pieces or verified sublots entered each run, the quantities and the corresponding records. Preserve the identification when the parts return.
What if one furnace load contained more than one machining lot?
Check whether the order allows that arrangement. If it does, obtain a load record that links each lot and its quantity to the common run and keeps the individual identities traceable.
What if the chart is missing the purchase order reference?
Ask the processor for the controlled record or corrected chart that satisfies the order’s linkage requirement. Have the responsible reviewer decide whether the evidence is adequate.
Who approves the records after repeat treatment?
Use the release authority named in the order. Identify the affected pieces, the approved disposition and the required process and test evidence for the later run.
Request a part-lot documentation review
Send HELE TITANIUM the part number and drawing revision, machining lot and return quantities, the applicable treatment requirement and required release documents. Review CNC titanium parts · Submit the documentation package
Prepare a technical enquiry
Share the product form, grade or standard, dimensions, quantity and inspection requirements.
Ask a technical question →