Free-State and Restrained Flatness for Thin Machined Titanium Parts
Agree on free-state or restrained flatness, the inspection setup and first-article records before ordering thin machined titanium parts.
Table of Contents
Agree on the condition in which flatness will be accepted before releasing the drawing or buying the parts. A thin titanium component can give different readings when supported for a free-state check and when held in an approved restrained setup. If the assembly also has a fit requirement, identify the fit check and its release criteria separately.
Identify the condition on the controlling drawing
Check all drawing sheets, general notes, the model where applicable, and any referenced inspection document. Find the controlled surface, the applicable requirement and any instruction that changes the measurement condition. Verify which drawing revision governs the order. If the documents leave the condition unclear, ask the design owner to resolve it before the quotation becomes the order.
ASME Y14.5 is a drawing and model language when incorporated into the project. The applicable edition and the actual drawing control interpretation. Send the referenced inspection or restraint notes with the enquiry. ASME Y14.5 publication information

Agree how the part will be supported and recorded
Describe where an unrestrained part rests and how its orientation and support will be reproduced. For an approved restrained check, identify the fixture and revision, locating and restraint points, any controlled applied loads and their sequence as defined by the owner. Put those conditions on the inspection plan. Treat a machining fixture as a separate setup until the buyer approves its use for acceptance.
| Review | What to record | What the decision applies to |
|---|---|---|
| Free-state flatness | Surface, orientation, agreed support and measurement record | The specified delivered condition under the approved setup |
| Restrained flatness | Approved fixture revision, location, restraint conditions and records | The specified condition under the approved restraint |
| Assembly fit | Mating drawing or agreed reference, assembly checklist and responsible party | Fit with the nominated interface under the approved check |
| First-article approval | Part identity, actual readings, setup evidence and deviations | Release decision for the stated design and inspection revision |
The comparison needs a consistent sampling or measurement plan as well as a common fixture. Agree where data are collected and what report will accompany the first part. If the supplier and receiving team use different instruments, confirm that both follow the same approved surface and condition. Establish who will review any mismatch before shipment.
Keep price options and acceptance changes traceable
Ask for the price on the released basis and list any alternative separately. If a proposed alternative changes the tolerance, fixture or acceptance condition, record the affected feature, the functional check and who approves the change. The request should make clear which basis applies to manufacture. See the HELE TITANIUM drawing and manufacturing route guide for how drawing decisions affect the proposed work.
When two results disagree, compare part identity, drawing revision, support, restraint, coverage and actual data before deciding which reading addresses the contractual requirement. If the two setups represent different conditions, route the discrepancy to the drawing owner. Ask which recheck it will accept and retain the original readings with the disposition.
Frequently asked questions
Can the inspection team clamp the part to make it sit flat?
Use the condition and restraint specified in the governing documents. Request approval for any setup that changes how the surface is supported or loaded.
Does a restrained flatness report also establish free-state flatness?
The report describes the restrained condition tested. If free-state flatness is required, specify and record that check separately.
What should a first-article report show about supports?
Record the orientation, support locations, fixture revision if used, measured surface, measurement coverage and actual results tied to the part and drawing.
What if the drawing calls for assembly fit as well?
Identify the mating interface, approved procedure and release authority. Keep fit evidence linked to its own criteria and retain the dimensional inspection record.
Can an alternative tolerance be quoted before it is approved?
Yes, as a separate option for review. Make the current drawing basis, proposed change and functional impact visible. The authorized drawing or order determines production release.
What if the buyer and supplier get different readings?
Reconstruct each setup and match the conditions to the controlling requirement. Ask the design owner to approve a comparable recheck or documented disposition.
Request a drawing and inspection review
Send HELE TITANIUM the released or clearly marked preliminary drawing, required inspection condition, mating or fixture information and first-article reporting requirements. Include the person responsible for approving deviations. Review titanium machined parts · Submit a drawing-based enquiry
Prepare a technical enquiry
Share the product form, grade or standard, dimensions, quantity and inspection requirements.
Ask a technical question →