Platinized Titanium Anode Buying Guide
Select a platinized titanium anode against the intended reaction, the complete electrolyte and the current delivered over the working surface.
Table of Contents
Select a platinized titanium anode against the intended reaction, the complete electrolyte and the current delivered over the working surface. The enquiry should identify the titanium substrate, the platinum requirement, the coated and uncoated areas and the connection details. Before placing the order, agree how the supplier will show that the delivered lot meets those requirements.
Match the electrode to the electrochemical duty
Describe the target process and state the solution composition, temperature range and contaminants that the cell is expected to encounter. Include current, the duty cycle, any polarity changes and how the electrodes are spaced and supported. For a replacement, show the installed assembly and document any change in chemistry, output or operating pattern since the original design. Those conditions determine which coating and substrate should be evaluated.
Where the buyer is considering Pt/Ti, Pt/Nb, an MMO-coated substrate or solid platinum, ask each supplier to identify the construction and the evidence supporting its use under the specified duty. List where the substrate or attachment could be exposed, which processes could damage the surface and what the design owner needs to verify before approving an alternative. MMO and platinized titanium comparison

Mesh electrode shapes with flat connection tabs and a threaded attachment on one piece. Product-page image illustrating electrode forms and connections. Substrate identity, platinum coverage and inspection results require the specified records.
Put the platinum requirement and coverage on the drawing
Record the substrate grade and product form, then mark the working faces, edges, attachment points and any areas that must remain uncoated. On a mesh or wire, state how active area is determined. Use the same reference area when comparing current density or a quoted platinum mass per unit area. If the order controls thickness at specific locations, show those locations and how the individual measurements determine acceptance.
A thickness requirement and a mass-per-area requirement describe different characteristics. Keep the quoted unit, reference area, acceptance limit and evidence attached to each metric. Ask suppliers to identify any calculation or conversion they propose and the assumptions it uses. If an electrical contact must stay bare or separately protected, include that condition on the same drawing revision.
Check installation, electrical load and the connection
Identify the mating fixture, mechanical support, current connection and dimensions controlling clearance or immersion. Check the material and protection of any conductor at an exposed joint, and state who supplies the mechanical and electrical interfaces. Require a drawing showing lead exits, holes and covered zones where those features affect installation. For an existing assembly, specify whether the buyer will reuse the support or buy the complete unit.
When comparing two offers, record total current and the applicable area on the same line. Ask how a supplier's estimate changes for expected peak load and the actual operating schedule. If a voltage or life claim matters to purchasing, request the configuration and operating conditions behind it along with the defined end point. Agree which tests demonstrate acceptance and which evidence supports longer-term use.
Agree the receiving records and treatment of deviations
Request a traceable substrate record, the approved coverage drawing and the inspection plan for the offered geometry. Identify sample selection, instrument and reference checks, reporting units and lot linkage. ISO 3497 describes X-ray spectrometric coating thickness methods. The supplier and buyer should establish suitability for the substrate, coating range and geometry. Agree how a witness sample represents the parts if it will support release. ISO 3497 catalogue scope Platinized titanium anode receiving inspection
Record the condition that requires hold, retest or design review, including unexpected exposed areas or results outside the agreed limit. Ask which drawing or material changes require buyer approval. If qualifying a variant, identify the duty, test interval and acceptance measures against a defined comparison specimen. Document responsibilities for replacement, installation and follow-up separately from the coating report.
Before requesting a quote
Send the electrolyte and operating duty, the drawing with coated and masked areas, the electrical connection and the platinum metric you need to verify. Include the intended inspection and delivery scope. HELE platinized titanium anode enquiries
Frequently asked questions
Which details matter when replacing an existing Pt/Ti anode?
Send the old drawing or part identification, the connection details and the actual duty. Report recent process changes and any observed wear areas so engineering can check the replacement basis.
How should an active area be listed for mesh?
State the area convention and coated portions on the drawing. Check that the current density and platinum metric in each offer use the declared basis.
Which documents establish the base metal and the coating?
Ask for separate records suited to each requirement, with identifiers linking both records to the delivered lot. Keep the approved drawing revision with them.
When can a witness coupon support the order?
Agree how the coupon represents the coating and process lot. Identify differences in orientation, shape or treatment that affect which conclusions can be applied to the part.
Can another substrate be accepted under an existing order?
Route the proposed change to the design authority. Ask for a comparison under the applicable conditions and approval of the revised specification before supply.
What should I ask for when a supplier quotes operating life?
Request the evaluated duty, configuration, end criterion, test or service evidence and limitations. Record any order-specific warranty separately.
Prepare a technical enquiry
Share the process or protected asset, operating conditions, geometry or drawing, and the scope you need reviewed.
Ask a technical question →