Stack and mounting
Confirm the stack configuration, mounting envelope, electrical terminals and fluid ports against the approved drawing.

PEM water electrolysis stack with 2000 mL/min catalogue hydrogen output. Check DC power, water and pressure interfaces for integration.
The CH11-1 is a PEM water electrolysis stack. Compare its 2000 mL/min catalogue hydrogen output with your required duty and confirm the operating point before selecting a configuration.
Compare the catalogue stack output of 2000 mL/min with your required duty. Use the stack specification table to check the DC supply, circulating water and installed envelope before reviewing the system interfaces.
HELE 2025 equipment catalogue, page 19 →
| Parameter | Catalogue value and conditions |
|---|---|
| Hydrogen production rate | 2000 mL/minPure hydrogen output stated in the stack catalogue. Confirm the operating point and measurement basis. |
| Mixed gas production rate | 3000 mL/minSeparate catalogue field for the combined hydrogen and oxygen output. |
| Circulating water temperature | 25–50 °CConfirm water supply, flow and heat removal for the operating point. |
| Maximum withstand pressure | 0.5–3.5 MPaCatalogue withstand figure. Agree operating and differential pressure separately. |
| Constant current | 25 ACatalogue electrical figure. Confirm power supply and operating point for the proposed configuration. |
| Constant voltage | 33 VCatalogue electrical figure. Confirm the operating voltage and DC power supply for the order. |
| Circulating water conductivity | ≤1 µS/cmCatalogue water-quality requirement. Confirm the full water specification and monitoring basis. |
| Dimensions without lugs and connections | 94 × 75 × 106 mmLength × width × height. Use the approved drawing for fit. |
| Dimensions with lugs and connections | 109 × 92 × 106 mmLength × width × height. Confirm mounting and service clearances. |
Confirm the stack configuration, mounting envelope, electrical terminals and fluid ports against the approved drawing.
Agree the DC supply, water circulation, cooling, gas separation and safety controls with the system integrator.
Specify the operating point, test conditions and records needed for the ordered stack.
Request the model-specific drawing, configuration list, inspection record and applicable conformity documents for the ordered unit.
A reusable worksheet for recording known conditions, units, document revisions and open questions.
Download CSV ↓
The manufacturer catalogue lists 2000 mL/min of hydrogen on page 19. Confirm the required duty and operating point for the order.
Confirm DC power, water circulation, heat removal, gas outlets, operating and differential pressure, and the connection and mounting drawing.
A configured installation requires specified power, fluid and gas handling, and controls. Agree which equipment is included in the quotation.
Reference CH11-1 and include: