CH11-1 PEM electrolyzer stack shown in the manufacturer catalogue
Model image from the manufacturer catalogue, page 19.
CH11-1

CH11-1 PEM Electrolyzer Stack

PEM water electrolysis stack with 2000 mL/min catalogue hydrogen output. Check DC power, water and pressure interfaces for integration.

Hydrogen output
2000 mL/min
Equipment format
PEM stack module
Maximum withstand pressure
0.5–3.5 MPa

Description & integration

The CH11-1 is a PEM water electrolysis stack. Compare its 2000 mL/min catalogue hydrogen output with your required duty and confirm the operating point before selecting a configuration.

Compare the catalogue stack output of 2000 mL/min with your required duty. Use the stack specification table to check the DC supply, circulating water and installed envelope before reviewing the system interfaces.

Technical specifications

HELE 2025 equipment catalogue, page 19 →

ParameterCatalogue value and conditions
Hydrogen production rate2000 mL/minPure hydrogen output stated in the stack catalogue. Confirm the operating point and measurement basis.
Mixed gas production rate3000 mL/minSeparate catalogue field for the combined hydrogen and oxygen output.
Circulating water temperature25–50 °CConfirm water supply, flow and heat removal for the operating point.
Maximum withstand pressure0.5–3.5 MPaCatalogue withstand figure. Agree operating and differential pressure separately.
Constant current25 ACatalogue electrical figure. Confirm power supply and operating point for the proposed configuration.
Constant voltage33 VCatalogue electrical figure. Confirm the operating voltage and DC power supply for the order.
Circulating water conductivity≤1 µS/cmCatalogue water-quality requirement. Confirm the full water specification and monitoring basis.
Dimensions without lugs and connections94 × 75 × 106 mmLength × width × height. Use the approved drawing for fit.
Dimensions with lugs and connections109 × 92 × 106 mmLength × width × height. Confirm mounting and service clearances.

Equipment & supply scope

Stack and mounting

Confirm the stack configuration, mounting envelope, electrical terminals and fluid ports against the approved drawing.

Equipment around the stack

Agree the DC supply, water circulation, cooling, gas separation and safety controls with the system integrator.

Acceptance basis

Specify the operating point, test conditions and records needed for the ordered stack.

Technical documents & evidence

Request the model-specific drawing, configuration list, inspection record and applicable conformity documents for the ordered unit.

Purchasing & drawing checklists

PEM project brief

A reusable worksheet for recording known conditions, units, document revisions and open questions.

Download CSV ↓
Check the revision on a saved document →
Manufacturer series photo
Manufacturer reference photo for the small-size stack series
Series reference. Use the catalogue image and approved drawing for this model. Manufacturer product page →

Frequently asked questions

What hydrogen output is listed for CH11-1?

The manufacturer catalogue lists 2000 mL/min of hydrogen on page 19. Confirm the required duty and operating point for the order.

What interfaces should I confirm?

Confirm DC power, water circulation, heat removal, gas outlets, operating and differential pressure, and the connection and mounting drawing.

What equipment is needed around the stack?

A configured installation requires specified power, fluid and gas handling, and controls. Agree which equipment is included in the quotation.

Review your project with HELE

Reference CH11-1 and include:

  • Required hydrogen output and duty cycle
  • DC power supply and operating point
  • Water quality, circulation and cooling conditions
  • Gas pressure, fluid interfaces and mounting drawing
  • Required test records and quantity
Send this model with your requirements →