Electrolysis core
PEM stack, process connections and defined operating envelope. Stack supply alone does not include a complete hydrogen plant.

5 Nm³/h catalogue hydrogen output. Separate hydrogen and power cabinets. Check delivery pressure, site utilities and scope.
For renewable hydrogen, combined heat and power, semiconductor and integrated energy projects requiring a defined hydrogen-production configuration.
Match hydrogen demand and delivery conditions to the process. Confirm downstream compression, storage and site integration as separate scope items.
HELE 2025 equipment catalogue, page 8 →
| Parameter | Catalogue value and conditions |
|---|---|
| Hydrogen production rate | 5 Nm³/hHydrogen output; confirm reference gas conditions and operating point. |
| Gas production rate | 7.5 Nm³/hSeparate catalogue field; do not use as hydrogen capacity. |
| Operating temperature | 5–65 °CCatalogue range; confirm the ordered operating envelope. |
| Hydrogen purity | 99.5–99.9999999% range printed in catalogue; selected gas-treatment configuration must be specifiedAgree gas-conditioning scope, sampling location, impurity limits and analytical method. |
| Dew point | −70 °CConfirm gas pressure basis, conditioning and measurement method. |
| Maximum allowable pressure | 3.0 MPaNot a rating for downstream compression, storage or dispensing. |
| Feedwater | ASTM D1193 Type I deionized water (>10 MΩ·cm), as printedConfirm the complete applicable water specification, monitoring and treatment scope. |
| Power supply voltage | 380 VConfirm phase, frequency, connection and electrical design. |
| Dimensions (L × W × H) | Hydrogen cabinet: 1300 × 950 × 1930 mm; power cabinet: 610 × 950 × 1930 mmConfirm drawing revision, access, maintenance and installation clearances. |
| Weight | 900 kgCatalogue weight; confirm shipment and foundation loads. |
| DC power consumption | 4.4 kWh/Nm³ H₂Catalogue DC value, not full-system AC consumption; confirm operating and measurement boundary. |
| Wide power range | 20–120%Catalogue wording; confirm reference rating and allowable duration. |
Compare the catalogue output of 5 Nm³/h with your average and peak demand. Check whether you need buffer storage and specify pressure and purity where the hydrogen is used.
Review PEM project planning and site requirements →Check space for the separate hydrogen and power cabinets. Confirm electrical phase and frequency, feedwater, cooling and control interfaces.
Review site utilities for PEM systems →Confirm which checks apply to the ordered system and what records are available for factory acceptance. Use the model-specific drawing for installation.
Review manufacturing and testing scope →PEM stack, process connections and defined operating envelope. Stack supply alone does not include a complete hydrogen plant.
Rectifier or DC power supply, PLC/HMI, measurement, alarms and communication interfaces as specified in the configuration.
Water treatment, circulation, heat removal and monitoring. Identify the incoming water specification and the cooling system responsibility.
Gas-liquid separation, drying and purification where specified. The gas-quality commitment must identify the treatment equipment and sampling point.
Downstream compression, cylinders, buffer storage and refueling equipment are separate scope items. Do not infer their inclusion from an electrolyzer pressure rating.
Skid or enclosure, piping interfaces, installation, commissioning, documentation and acceptance testing must be assigned explicitly.
Request the model-specific drawing, configuration list, inspection record and applicable conformity documents for the ordered unit.
A reusable worksheet for recording known conditions, units, document revisions and open questions.
Download CSV ↓It is the hydrogen-production system designation on page 8 of the supplied 2025 catalogue, with 5 Nm³/h listed hydrogen production. The ordered configuration and revision must be stated in the proposal.
No. Gas production and hydrogen production are separate catalogue fields. Use the hydrogen-production rate to discuss your hydrogen demand.
Agree the equipment list for the stack, power supply, water and cooling, separation, drying or purification, controls and enclosure. Downstream compression, storage, installation and commissioning are separate scope decisions.
Agree the required impurities and moisture at the delivery point, together with gas treatment and the measurement method. Catalogue figures alone do not define a guaranteed gas-quality package.
The catalogue labels its value as DC power consumption. It does not establish complete-system AC consumption including conversion losses and auxiliaries.
Quote CH-5Nm³/h, the catalogue revision, operating schedule, gas-delivery pressure and quality, installation country, water, cooling, electrical supply and required documents. The enquiry link carries this model and page context.
Reference CH-5Nm³/h and include: