MGPS or ICAF anode replacement
Identify the role of each installed anode and provide the existing material specification, dimensions, flange or support and cable details.
Identify the seawater circuit and installed marine growth prevention technology before specifying a replacement anode or cell.

A sea-chest anode assembly and an electrochlorination cell can both serve biofouling control, with different components and procurement inputs. Start with the system type, its equipment reference and the seawater circuit it serves.
Identify the role of each installed anode and provide the existing material specification, dimensions, flange or support and cable details.
Provide the system and cell references, seawater service conditions and who is responsible for the cell and connected equipment.
Check the installed system specification and circuit drawing. Keep marine growth prevention and hull corrosion protection as separate project duties.
| What to compare | What to provide | What it helps confirm |
|---|---|---|
| System and location | Give the vessel or equipment reference, sea chest or circuit location and system type. | Which installed assembly and drawings apply. |
| Seawater operating basis | Share the water source and relevant flow, temperature and seasonal conditions. | The service basis for reviewing the selected anode or cell. |
| Anode and interfaces | Provide the approved material, assembly envelope, flange or mount, cable and terminal details. | Which replacement can match the existing mechanical and electrical interfaces. |
| Maintenance scope | Document the failed or worn parts and the installation or outage window. | Which parts and accessories should be included in the order. |
Review MGPS anode assemblies for the installed system and confirm the function of each material against the equipment records. For electrochlorination, review the cell and complete-system scope separately.
Review water conditions and equipment scope for electrochlorination.
Find anode and monitoring options for corrosion protection when that is a separate project requirement.
Check inspection and documentation options for replacement assemblies.
For a seawater electrochlorination cell, see what feedwater data and electrode details to request before comparing coatings.
See how corrosion control and marine growth prevention fit different vessels, structures and seawater circuits.
Record known requirements, units, source documents and open questions. A planning worksheet, not a product specification or certificate.
Download CSV ↓