OEM Interface Approval for Anodes and PEM Equipment
Agree interface drawings, scope boundaries and responsible parties before releasing a coated anode or PEM equipment order.
Table of Contents
An equipment order is ready for release when the supplier and OEM have agreed the drawing or interface schedule, who provides each connected item, and who is responsible for the checks that will establish fit and operation. Use a single revision for quotation and approval.
Sign off the mechanical and electrical interfaces for an anode assembly
The OEM should provide the layout, mating parts, operating chemistry and current basis. Ask the anode supplier to return the controlled dimensions, coated and masked areas, electrical connection details and any interface items included in the offer. The approval drawing should show clearances and how the assembly is mounted or removed. Agree who verifies the mating hardware and whether a check is required before the first production order.

HELE graphic showing a titanium anode and PEM equipment for OEM projects. Interface review links the equipment drawing, operating conditions and acceptance documents.
Sign off the utility and gas interfaces for PEM equipment
Specify the hydrogen delivery point and connect it to the site or equipment owner’s power, water, cooling, controls and gas-handling responsibilities. Mark the exact point where the OEM connects to the supplier’s scope. Review the information against the equipment list and the factory and site acceptance plans. Ask for utility limits and the tests that verify an interface under the intended operating profile.
| Review item | OEM or project owner | Supplier | Evidence for approval |
|---|---|---|---|
| Fit and connection | Provide mating layouts and operation envelope | Return detailed interface dimensions and exclusions | Approved drawing or interface control document |
| Operation and handover | State site conditions and intended verification point | Confirm equipment conditions and supplied functions | Controlled equipment and utility schedules |
| Verification | Define witness, release and handover requirements | Provide proposed tests and their limitations | Agreed inspection and acceptance plan |
The people approving the order should share the same record of open items. Send revised drawings to every party whose scope changed. Titanium anode purchasing checklist · PEM balance-of-plant scope
Frequently asked questions
Who owns the mating hardware check?
Assign the check in the interface document. The OEM generally has the mating assembly details; the supplier should confirm dimensions and responsibilities for hardware it quotes.
Can we use a supplier’s standard drawing to release a custom item?
Tie approval to the offered configuration and revision. Confirm the critical changes and inspection before issuing the purchase order.
What changes should trigger another interface review?
Review any change to drawing, active area, electrical connection, utility basis or equipment list that could alter fit, performance or verification responsibilities.
When should a test move from the factory to site?
Assign site verification when a requirement depends on installed utilities, mating equipment, site controls or equipment outside the factory scope. Keep the required result and responsibility in the acceptance plan.
Prepare a technical enquiry
Share the process or protected asset, operating conditions, geometry or drawing, and the scope you need reviewed.