Industries · Titanium Anodes

Infrastructure & Asset Protection

Match anodes and reference electrodes to the approved cathodic protection design for pipelines, storage tanks and reinforced concrete assets.

Pipeline and buried-structure cathodic protection application visual
Pipeline cathodic protection example. The approved design determines the installation and monitoring requirements.

Start with the Asset and Its Exposure

Pipelines and buried structures

Identify the protected route and the approved groundbed or anode arrangement. Share cable routing, terminations and any installation constraints.

Storage tank bottoms

State whether the project is a new tank or a retrofit. Provide the bottom layout, anode arrangement and monitoring requirements from the protection design.

Reinforced concrete assets

Define the structure, protection zones, access restrictions and reference electrode positions from the approved layout.

Choose the Application for Your Project

Start with the protection method and installation defined by the project engineer. Use the design schedule to identify anodes and monitoring components for quotation.

Technical Guides and Project Worksheets

Purchasing & drawing checklists

Cathodic protection supply worksheet

Record known requirements, units, source documents and open questions. A planning worksheet, not a product specification or certificate.

Download CSV ↓
Purchasing & drawing checklists

Reference electrode review worksheet

Record known requirements, units, source documents and open questions. A planning worksheet, not a product specification or certificate.

Download CSV ↓
Check the revision on a saved document →

Before Requesting a Quote

What to Send for Review

  • Asset type, site and project design reference
  • Approved anode schedule, design basis and installation drawings
  • Reference electrode specification and monitoring layout, where applicable
Discuss Your Project →

What to Agree Before Ordering

  • Use the approved protection design as the basis for the supplied components.
  • Record cable, sealing, mounting and inspection scope in the quotation.
  • Confirm responsibility for installation, commissioning and protection verification.
Quality & Documentation