Replacement to an approved drawing
Identify the cell reference and affected electrode. Provide the drawing and any prior approval criteria.
Identify the installed cell, electrode assembly and approved service scope before comparing a replacement anode or retrofit proposal.

An installed cell has interfaces controlled by its equipment documentation. Start with the cell reference, drawing revision and condition of the removed electrode to establish the scope of any replacement or retrofit.
Identify the cell reference and affected electrode. Provide the drawing and any prior approval criteria.
Document what is proposed to change and whether the owner or OEM requires inspection of the substrate or separate approval.
Use the plant’s approved design basis and inspection history to evaluate fit and the boundary of the supplied part.
| What to compare | What to provide | What it helps confirm |
|---|---|---|
| Cell identification | Supply the installed model, reference drawing and revision. | Which interfaces and approval requirements govern the work. |
| Assembly condition | Share inspection records for distortion, connection damage and coating wear. | Whether the proposal covers a replacement or requires condition assessment. |
| Existing connections | Provide the approved coated zones, connection and envelope drawing. | What must be controlled on the replacement assembly. |
| Approval boundary | Name the party responsible for approving the part and any change to the cell. | Which documentation and acceptance steps are required before use. |
Ruthenium–iridium and other MMO anode families can be reviewed against the approved electrode specification. Confirm the coating and mechanical fit with the equipment owner before selecting a replacement.
Record the part, service history and condition before comparing a replacement.
Identify the drawings and inspection records required for the order.